8. Benchmarks

(Under construction!) This page concerns a previous release of TuLiP: version 0.4a or earlier.

This page aims at summarizing some benchmark results to assess TuLiP’s and underlying algorithms’ (i.e., solvers) capabilities to solve large scale problems. We provide computation times and memory requirements as a function of various (sometimes domain-specific) complexity measures.

TuLiP compatible solvers in version 0.4a were:

  • GR(1) game solvers: gr1c, JTLV

  • Model Checkers: NuSMV, SPIN

  • SMT solver: yices

8.1. Robot Motion Planning

8.1.1. Gridworld Benchmarks

The first example here compares two model checkers, NuSMV and SPIN, used for logic synthesis, in a robot motion planning example. We consider a robot that moves in an nxm grid (complexity measure is grid size, i.e. n times m) with randomly generated static obstacles (20% of the grid is filled with obstacles) and tries to reach a goal position. The model checker either finds a path such that the robot reaches the goal while avoiding the obstacles or declares that no such path exists.

spin-nusmv.png

Please see [S12] in the Bibliography for additional comparisons between NuSMV and SPIN with different sets of performance criteria and complexity measures.

For the same robot motion planning example, the following graph shows that when reactiveness to the environment is not required (e.g., when the environment is static), using a model-checker for logic synthesis scales much better than a more general game solver such as gr1c.

logic-synt-vs-game.png

8.2. Aircraft Electric Power Systems

8.2.1. Untimed (static) Specifications

Consider an electric power system base topology that includes both AC and DC components. Each vertical set of components (AC generator, AC bus, rectifier unit, DC bus, and two contactors) form a base unit. Figure 2 shows two base units connected to each other, while additional units may be added, as represented by the dotted lines. Table 1 compares the time it takes to convert a set of primitives for a given base topology into formal specifications compatible with Yices (Y) and TuLiP (T). Table 2 compares the time it takes for Yices and TuLiP to solve/synthesize a controller for a given topology, as well as the amount of memory.

Table 1: Specification Conversion Time for Yices (Y) and TuLiP (T) [time in seconds]

Base Units

Nodes

Edges

Conversion Time (Y/T)

4

16

18

.13/.11

5

20

23

.25/.26

10

40

48

24/18

12

48

58

141/111

15

60

73

1634/1205

Table 2: Comparison of Synthesis Time for Yices (Y) and TuLiP (T). [time in seconds]

Base Units

Yices Env.

Time (Y/T)

Mem. (Y/T)

4

25

.25/10.7

25MB/215MB

5

36

.82/1015

36MB/16GB

10

121

205.7/-

53MB/-

12

169

1410/-

158MB/-

15

256

62208/-

1.2GB/-

Part of an AES topology showing two vertical sets of components, each with AC generator, AC bus, rectifier unit, DC bus, and two contactors.

Figure 2

8.2.2. Timed Specifications

For the topology in Figure 3, Table 3 lists the automaton size as well as total synthesis time while varying the number of clocks, as well as the discretization of clock “ticks.” The first column indicates the number of clocks, or counters, used in the synthesis problem. One clock refers to one essential bus that can never be unpowered for more than some number of ticks. The second column thus indicates the maximum time in which the essential bus can be unpowered (i.e., how large the discretized clock space must be). The higher the number, the more clock ticks must be incorporated into the synthesis problem. The third and fourth columns refer to the total automaton size (i.e., number of states) generated, as well as the total computation time (in seconds), respectively.

Table 3

No. of Clocks

Clock “Ticks”

Aut. Size

Time [sec]

1

1

32

1.5

1

3

64

1.7

1

5

96

1.7

1

10

176

2.8

1

20

336

3.1

2

1

79

2

2

3

96

2

2

5

224

2.1

2

10

384

2.5

2

20

704

2.5

3

1

478

3.5

3

3

2858

7

3

5

7180

160

3

10

45492

1084

3

20

88604

4796

4

1

1798

7.2

4

3

22008

308

4

5

93386

4778

AES topology with four generator-contactor-bus columns, where the buses are connected in series by contactors.